Production Part Approval Process

PPAP Management

Digitise the complete PPAP submission lifecycle. Quality Pigeon covers all 18+ forms, from initial concession requests through to Part Submission Warrants — structured, auditable, and version-controlled.

Key Features

Everything for PPAP in one place

No more juggling spreadsheets, email attachments, and shared drives. One structured platform for the entire submission lifecycle.

All PPAP forms in one platform

From F001 Concession Requests through to F032 APQP Status — every form is structured, guided, and version-controlled.

Automatic form generation

Select the submission level (1-5) and the platform generates all required forms automatically. No guesswork.

Real-time completion tracking

Visual progress indicators show exactly which forms are complete, in progress, or not yet started.

Full audit trail

Every change is versioned with timestamps and user attribution. Complete traceability for audits and customer reviews.

Workflow management

Structured status workflow from Draft through In Progress, Submitted, and Approved. Clear ownership at every stage.

Part and supplier master data

Manage part numbers, revision levels, supplier details, and customer requirements in one central location.

Coverage

20+ structured forms

Every PPAP form is built into the platform with guided inputs, validation, and automatic cross-referencing between related forms.

Concession RequestControl Quality PlanControl PlanPart Quality HistoryCQP InspectionDimensional ReportMaterial Test ResultsAssessmentPerformance Test ResultsProcess Flow DiagramPart Submission WarrantSupplier InformationSupplier TrialTrial LabelProcess ChangeGraining ApprovalDFM ReviewCapacity AnalysisPPAP Requirements ChecklistAPQP Status

Submission Levels

All 5 levels supported

Select the submission level and the platform generates all required forms automatically. Each level determines the scope of documentation.

1

Level 1

Part Submission Warrant (PSW) only — submitted to the customer

2

Level 2

PSW with product samples and limited supporting data

3

Level 3

PSW with product samples and complete supporting data

4

Level 4

PSW and other requirements as defined by the customer

5

Level 5

PSW with complete supporting data reviewed at the supplier site

Ready to digitise your PPAP submissions?

See how Quality Pigeon structures the entire PPAP lifecycle in a guided demo.